Lexaria to open new well
WILKINSON COUNTY — Lexaria Corp. announces that it expects to spud a new well in its Belmont Lake oil field in Southwest Mississippi on or about Sept. 21. This well, the PP F-12-4 will target the same oil formation as the company’s existing two producing oil wells in the field.
If field conditions permit, this well will be drilled and completed as a horizontal well located approximately 330 feet to the north of the existing PP F-12 and PP F-12-3 oil wells. Assuming success, the well should be completed and tested by early October and tied into production lines and tanks not later than November.
Lexaria, which is based in Vancouver, British Columbia, Canada, and primarily works projects in Mississippi, has a 35.7 percent interest in the PP F-12-4 well, comprised of a 27.7 percent perpetual interest plus an 8 percent interest in the well revenue until such time as the well returns 500 percent of invested capital, at which time the 8 percent interest only, ceases.
To sign up for Mississippi Business Daily Updates, click here.
Top Posts & Pages
- Fervor grows for Tuscaloosa Marine Shale
- Nullification and interposition
- Court rules in clinic dispute involving St. Dominic, HMA
- TROTTER: Social security claiming strategies
- District at Eastover construction to start later this year
- Commission eyeing unauthorized changes to historic structures
- Small business owners take picture perfect advantages with Instagram
- With no interim, board begins hunt for MVSU president
- Click Boutique revives Hattiesburg downtown retail district

![[RSS Feed]](http://i2.wp.com/msbusiness.com/wp-content/plugins/tdc-sociable-toolbar/rssfeed.png)
![[del.icio.us]](http://i0.wp.com/msbusiness.com/wp-content/plugins/tdc-sociable-toolbar/delicious.png)
POST A COMMENT