Phillips to build bridges near port

by

Published: April 1,2010

Tags: roads and birdges, transportation

LOWNDES COUNTY — Phillips Contracting Co. will start building two brand new bridges in May west of the Lowndes County Port, complete with a new stretch of road off old Highway 82, now known as Highway 182, with $2.9 million in funds appropriated by the Mississippi Department of Transportation.

Around the same time, Severstal plans to double its production and traffic through the port’s West Bank.

The bridges will be constructed directly to the south of two old bridges along Old Highway 82 just west of the Tennessee-Tombigbee Waterway.

The old bridges were constructed to handle just 57,000 pounds at a time, instead of the 80,000-pound capacity that is standard today. The new bridges will be capable of handling 88,000-pound loads.

“That’s hampered the port to some degree,” said John Hardy, Lowndes County Port director. “So The (Columbus-Lowndes Development) Link, the (Tennessee-Tombigbee) Waterway (Development Authority) and the port began mounting an effort to get those bridges replaced; especially since Severstal is expanding and expect to double their capacity.”

Mike Tagert, administrator of the Tennessee-Tombigbee Waterway Authority, said the new bridges will benefit the port in the short term by accommodating Severstal’s expansion, but could also draw attention from new businesses.

“The reason we’re so interested in this is it’s going to greatly increase the ability of the port long term to do what we want to do. There are development sites on that side of the river that this increases their marketability. Maybe we can bring in another major manufacturer,” said Tagert.

Plus it adds to the prestige of Lowndes County being the only port in Mississippi operating on both sides of a major river.

Charlie Furman, external relations manager for Severstal, said the increased bridge capacity will be right on time for the company’s expansion. By the end of 2011, Severstal hopes to increase its capacity from melting 1.7 million tons of steel each year to 3.4 million tons, which will result in approximately 100 new jobs.

Severstal has been driving over the old bridges without a problem and will continue to use the old bridges until the new bridges are opened, but their time is limited.

“The highway department told us they didn’t think (the old bridges) would hold up for continued use. With the existing scrap load doubled, replacing those bridges was going to be even more important,” said Joe Higgins, president of the Columbus-Lowndes Development Link.

Bob Phillips, of Phillips Contracting, said the bridge project has been in the works for the past three years but wasn’t awarded until this past week. One sticking point was increased erosion control measures put in place by the U.S. Environmental Protection Agency.

Phillips’ team will begin work this May with a target completion date of May 2011. Phillips will be responsible for taking down the old bridges after opening the new ones.

[RSS Feed] [del.icio.us]



To sign up for Mississippi Business Daily Updates, click here.

One Response to “Phillips to build bridges near port”

  1. Twitter Trackbacks for Mississippi Business Journal » Blog Archive » Phillips to build bridges near port [msbusiness.com] on Topsy.com Says:

    [...] Mississippi Business Journal » Blog Archive » Phillips to build bridges near port msbusiness.com/blog/2010/04/phillips-to-build-bridges-near-port – view page – cached * Home > COMMERCE – Market Sector, NEWS > Phillips to build bridges near Filter tweets [...]

POST A COMMENT

 

FOLLOW THE MBJ ON TWITTER

Twang & Tourism: The Country Music Trail

Our annual "Come See Us" magazine offers ideas for spots in Mississippi ranging from golf to culture to history to food. Click the photo for ideas, stories and access to the digital edition of this year's magazine.

Top Posts & Pages

%d bloggers like this: