Corps gives notice to proceed on Delta project

by

Published: October 14,2011

Tags: engineers, flood control, flooding, floods, river, sediment

MISSISSIPPI DELTA — The U.S. Army Corps of Engineers’ Vicksburg District has given a notice to proceed with work on the Big Sunflower, Steele Bayou Sediment Reduction Structures project.

The contract designation, W912EE-11-C-0008, in the amount of $878,577, was awarded to RAF Contracting Inc. of Columbus.

This Corps project reduces sediment loads, which naturally deposit into streams and waterways, according to the Corps. This reduction will improve channel flow, environmental impacts and water quality in the basin. By reducing erosion from the surrounding fields, phosphorous and nitrogen entering the waterway would be reduced.

Work will begin in approximately 30 days.

[RSS Feed] [del.icio.us]



To sign up for Mississippi Business Daily Updates, click here.

POST A COMMENT

 

Twang & Tourism: The Country Music Trail

Our annual "Come See Us" magazine offers ideas for spots in Mississippi ranging from golf to culture to history to food. Click the photo for ideas, stories and access to the digital edition of this year's magazine.

FOLLOW THE MBJ ON TWITTER

Top Posts & Pages

%d bloggers like this: