Post-flood levee repair, and its funding, is getting lots of attention
by Clay Chandler Published: September 18,2011
Tags: flood, levee, Mississippi River, Save the Delta, U. S. Army Corps of Engineers
Another phase of the recovery from the historic spring flood has started – the race to repair and rebuild the levee system that was strained by the high water, and the political process to pay for it. Relentless spring rainfall in the Lower Mississippi Valley combined with annual snow melt in the upper Midwest filled [...] [...]
